company the beginning legislation download where contacts
certifications
references
land reclamation
      methodology

LAND RECLAMATION METHODOLOGY

The Yard
Clearance of surfaces
Depth Clearance
Excavation Investigations
The final stages
Room Expansion

Depth clearance
Depth clearance is carried out by drilling through the soil to the level set by technical requirements. It is carried out by subdividing the foreseen area into squares with sides of 2,80mx2,80.m In the centre of each square, a hole is drilled and there a probe of the instrument is lowered for verification. This subdivision permits the checking of the soil in depth of any residuals of medium and large dimensions.


CO.VE.SMI. s.r.l. - via Cherubini, 8 - 46035 - Ostiglia Mn - P.Iva 01859630202 Privacy Policy credits